Idle Time Analysis of Construction Equipment by Digital Image Processing

Authors

  • Minal R.Balki Research Scholar, Department of Civil Engineering, D.Y.Patil Institute of Engineering & Technology,Pimpri, Savitribai Phule Pune University, Pune, India.
  • H.H. Salunkhe Assistant Professor,, Department of Civil Engineering, D.Y.Patil Institute of Engineering & Technology,Pimpri, Savitribai Phule Pune University, Pune, India.
  • Dr.Ushadevi Patil Professor, Department of Civil Engineering, D.Y.Patil Institute of Engineering & Technology,Pimpri, Savitribai Phule Pune University, Pune, India

Keywords:

Construction equipment, Digital imaging Equipment

Abstract

Correct analyses of construction equipment idle time have great importance for the cost effective energy having of construction equipment’s in mega project. The higher productivity can achieve with the less idle time of equipment, however, it is idle time by human usual observation. This paper describes image-processing based methodology to automatically assess\count the idle time of hydraulic excavation. The image color space (HSV)(Hues, Saturation and Values) are used as basis far tracing algorithm and image segmentation. The HSV color space shows important advantages over the RGB (Red, Green and Blue) color space in determining and tracing construction equipment. 

References

Y. Wu and H. Kim, “Digital Imaging In Assessment Of Construction Project Progress” Proc.21st International Symposium on Automation and Robotics in Construction, IAARC, Jeju, Korea

Jorge Abeid Neo, David Arditi, “Using Colors to Detect Structeral Components in Digital Pictures” Computer Aided Civil Engineering, Volume 17, No.1 (2002)61-67

Seokhe Chi, Carlos Caldas, “Image Safety Assesment: Automated Spatial Safety Risk Identification of Earth moving and Surface mining Activities” (ASCE)CO.1943-7862 March 2012

L.Y. Liu, Y.M.A. Hashash et.al., “Digital Image Reasoning For Tacking Excavation Activities”, Automation in Construction 17 (2008) 608-622.

Timothy C. Lukins, Emanuel Trucco “Towords automated visual assesment of progress in construction project” Journal of architectural engineering and design management, 1(1), 2004

Honjo Kim, Kinam Kim, Sungjae Park, “An Interactive progress monitoring system using image processing on mobile computing environment”, The 31st International symposium on Automation and Robotics in Construction and Mining (ISARC2014).

Changyoon Kim, Yeonjong Ju et al, “Bridge Construction Progress Monitoring using Image Analysis” The 25th International symposium on Automation and Robotics in Construction and Mining (ISARC2009)

Zou, J and Kim H, “Using HSV Color Space for Construcction Equipment Idle Time Analysis” Journal Of Computing In civil Engineering, 21(4), 238-246,2007